Green & Brown Field

substation project goldsboro, nc

Goldsboro, NC – A green field installation was performed of new 115kV substation ground grid, conduit, foundations, steel structure, oil containment, control house and fine grade and rock. Additionally, the crews performed the brown field decommission of the existing station. They removed existing steel, equipment and foundations. Crews installed substation on existing site including the foundations, conduit, ground grid, trench box and all equipment. This station was be built within 10 ft of the energized station. A planned outage was taken, and the 2 low side bays were connected to the tie breaker bay.