Apex, NC – Residential growth created a need to expand the capacity of the an existing substation. Our scope included the removal of one 24kV feeder breaker, three 432kVA feeder regulators and one 230kV disconnect switch. In addition to the equipment removals, a 24kV temporary mobile bus was removed. Additions to the substation included two new steel A-frame structures, conduit, ground grid, new foundations, oil containment, 230/24kV Transformer, disconnect switches, breakers, and voltage regulators.