Solar Interconnects

solar and wind projects North Carolina

North Carolina EPC – While working for North Carolina, EPC Volt crews installed more than 30 solar interconnects, ranging from 3-pole to 275-pole interconnects. We are capable of installing all overhead conductor along with pole line work and making the terminations at the riser/dip pole. We provide resources for maintenance/emergency situations and are typically available […]

Solar Farm

solar and wind projects North Carolina

North Carolina – Volt crews have installed over 100 solar interconnects while working for a solar farm project in North Carolina. These interconnects have ranged from 3-pole to 30-pole and 2-pad mounts to 30-pad mounts transformer interconnects. We are capable of installing all underground and overhead conductor along with pole line work and making the […]

Master Service & Construction Agreement

telecommunications texas

Texas – Volt Power began construction on a new fiber optic infrastructure ring connecting multiple customer administrative buildings, service centers, and substations. Volt began with phase 1 which started at their service center and continued through five more substations over 150 miles.

Fiber Optic Cable Project

fiber optic project tulsa, ok

Tulsa, OK – Volt Power completed various 48 and 96 strand All Dielectric Self Supporting (ADSS) fiber optic cable projects through-out a Distribution and Transmission system where 28 miles of fiber cable was installed, spliced, terminated and tested by Volt across eleven substations.

Fiber Optic Cable Project

San Angelo, TX – Volt Power completed various 48 strand All Dielectric Self Supporting (ADSS) fiber optic cable projects through-out a transmission system where over 25 miles of fiber cable was installed, spliced, terminated and tested across 10 substations.

Hurricane Florence

Volt sent 143 crews to respond to Hurricane Florence

Volt provided 143 Crews to help with power outages during Hurricane Florence. Hurricane Florence was a powerful and long-lived storm that caused extensive damage in the Carolinas in September 2018, primarily as a result of freshwater flooding.

Hurricane Irma

volt crews responded quickly to hurricane irma

137 Volt Crews responded to provide assistance during Hurricane Irma. Hurricane Irma was an extremely powerful Cape Verde hurricane that caused widespread destruction across its path in September 2017. It was also the most intense hurricane to strike the continental United States since Katrina in 2005. Source – https://en.wikipedia.org/wiki/Hurricane_Irma

Hurricane Michael

volt provides emergency services during hurricane Michael

Volt sent 130 crews to assist with Hurricane Michael recovery. Hurricane Michael was the first Category 5 hurricane to strike the contiguous United States since Andrew in 1992. In addition, it was the third-most intense Atlantic hurricane to make landfall in the contiguous United States in terms of pressure, behind the 1935 Labor Day hurricane […]

Joint Use Agent

joint use agent project Louisiana

Louisiana – Volt handles total pole management for the utility including contract negotiations, permitting, safety audits, attachment audits and billing. Volt’s technical specialists are all experts with years of hands-on industry experience able to take personal responsibility for quality results and complete customer service.

Joint Use Permitting

joint use project Texas & Louisiana

Texas + Louisiana – A regional utility utilizes Volt as its preferred provider for their Joint Use Permitting, Post Inspections and Attachment Audit needs as a one stop source to ensure responsive and quality results.